Home > News

Meteorology contributes to the power generation of Wudongde hydropower station

Source:China Meteorological Administration23-12-2020

On December 19, the world’s 7th hydropower station, 3rd unit of the left riverside of the Wudongde hydropower station ended the 72-hour trial operation and was officially put into operation.

Staff from meteorological departments from Yunnan carried out the installation, maintenance, overhaul of 10 automatic stations and also conducted annual inspection and maintenance to ensure the construction operation of the hydropower station.

Observation staff were carrying out daily maintenance of automatic stations.

Editor: Liu Shuqiao