Signal |
Meaning |
Preventive Measures |
|
In 12 hours, the snowfall will be up to 4 mm., or has been above 4 mm., and will continue; the snowfall is likely to affect transportation and agriculture and animal husbandry. |
1. Government and related sectors should do preparation work for snow hazard and icing damage; 2. The sectors of transportation, railway, electronic power, telecommunication, and others should carry out patrol, investigating and maintenance of road, railway, electronic lines, and clear the snow cover; 3. Passengers and drivers should take preventive measures for cold weather, and slippery road; 4. Agriculture areas and animal husbandry farmers should reserve forage for possible snow hazard and icing damage; 5. Reinforce trellis and other temporary structures. |
|
In 12 hours, the snowfall will be up to 6 mm., or has been above 6 mm., and will continue; the snowfall is likely to affect transportation and agriculture and animal husbandry. |
1. Government and related sectors should implement preparation work for snow hazard and icing damage; 2. The sectors of transportation, railway, electronic power, telecommunication, and others should strengthen patrol, investigating and maintenance of road, railway, electronic lines, and clear the snow cover; 3. Passengers and drivers should take preventive measures for cold weather, and slippery road; 4. Agriculture areas and animal husbandry farmers should reserve enough forage for possible snow hazard and icing damage; 5. Reinforce trellis and other temporary structures. |
|
In 6 hours, the snowfall will be up to 10 mm., or has been above 10 mm., and will continue; the snowfall is likely to affect or has affected transportation and agriculture and animal husbandry. |
1. Government and related sectors should do a good job of emergency work for snow hazard and icing damage; 2. The sectors of transportation, railway, electronic power, telecommunication, and others should strengthen patrol, investigating and maintenance of road, railway, electronic lines, and clear the snow cover; 3. People should reduce unnecessary outdoor activities; 4. Reinforce trellis and other temporary structures, and drive livestock to covered pen. |
|
In 6 hours, the snowfall will be up to 15 mm., or has been above 15 mm., and will continue; the snowfall is likely to affect or has affected transportation and agriculture and animal husbandry.
|
1. Government and related sectors should do a good job of emergency and disaster rescue work for snow hazard and icing damage; 2. Schools and operations should be stopped if necessary except special industry; 3. Airplanes, railway, and expressway operations can be stopped if necessary; 4. Disaster rescuing and relief should be carry out in pastoral areas and others. |